AdirPro 765-09 Heads Up Level for Rods and Poles With 40 Minute Vial

    By AdirPro | Mfr#: 765-09 | Tiger#: TS26173
    AdirPro 40 Minute Prism Pole Adapter ADI765-09
    • AdirPro 40 Minute Prism Pole Adapter ADI765-09
    • Item thumb

    Highlights

    • Includes an added leveler on the side to view directly at eyelevel
    • Features the 40 min vial
    • Excellent for work near heavy traffic
    • It’s best for rods and poles that are held so that you can veiw it's accuracy for extended time.
    • Excellent for areas with lots of vibrations
    • Includes a long locking screw
    • Fastens to 1 to 1.25-inch diameter poles and rods.
    • Fits onto round or rectangular rods or poles. 
    More Product Details What's Included
    List Price: $79.95
    $47.95
    You Save: $32.00 - 40%
    Availability:In Stock
    Ships Out Within: 24 - 48 Hours

    California Proposition 65 Warning. This product can expose you to chemicals including lead, which are known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov

    Equivalent to SEC5001-20

    Overview for AdirPro 765-09 Heads Up Level for Rods and Poles With 40 Minute Vial

    The Level for Rods and Poles With 40 Minute Vial is a leveler for rods and prism poles, fastening it to the pole or rod will assist you in determining that it is erected perfectly upright. This leveler comes with an added leveler on the side so that you can view it directly at eyelevel thereby providing an element of safety that construction and surveying professionals need in traffic-congested or other potentially hazardous job sites. It also makes it simpler to level and accepts all shapes of rods and poles, sizes 1 to 1.25-inch diameter.

    A 40 min. vial is a less sensitive leveler than the 20 min. or 8 min. it would be best for projects that involve holding the pole by hand thereby providing accuracy for extended time, whereas the other vials though they are more accurate won’t be able to provide the best in areas with lots of vibrations such as near roads or at construction sites, therefore in those areas it would be best to use a 40 min. vial.